Claxton-Smith--Sons-Concrete-arrow Claxton-Smith--Sons-Concrete-arrow Claxton-Smith--Sons-Concrete-arrow Claxton-Smith--Sons-Concrete-arrow Claxton-Smith--Sons-Concrete-arrow Claxton-Smith--Sons-Concrete-arrow Claxton-Smith--Sons-Concrete-arrow Logo

Custom lagging projects

All of Smith Concrete's Lagging projects are custom manufactured to your needs and specifications.

 

Typical lagging projects take about 14-30 days lead time on  manufacturing.

We'll even recomend the right contractor for your job.

 

304-755-5000

Retaining walls and Slip Repair

Lagging is typically used beside roads and driveways to provide fast and strong slip repair.  Other uses include sink hole prevention, shoring up a riverbank, or even a back yard project that will help protect against mudslides.

Call our office for lagging design quotes.

We design and build

We manufacture industrial grade concrete lagging.

Need a company that can manage your job from start to finish?  Look no further than Smith Concrete.

 

We can design the lagging project to your specifications and recommend the right contractor to do an install at your site.

Square park wall 2 park wall 1